Geothermal generator station in China

2022-05-13

The installed power of wellhead power station is 3.1MW and the designed net power is 2.06MW.Advanced hybrid condensation technology is used.

20210527115592019201.jpg

网站地图Shanghai GEO: Instrumented Rapid Load Test China . Instrumented Pile Load Test China